Tín chỉ thử nghiệm
Các tín chỉ thử nghiệm hiện tại có thể áp dụng vào các hệ thống đánh giá LOTUS (LOTUS NC, LOTUS BIO, LOTUS SB, LOTUS Interiors, LOTUS Small Interiors, LOTUS Homes, và LOTUS Homes C&S) và có thể tính vào điểm EP.
Credit code | Credit name | Criteria | Points | Date issued |
---|---|---|---|---|
EP-PL1 | LOTUS AP | Involve a LOTUS AP as a member of the Design Team (green building consultant, architect, MEP engineer, structural engineer, etc.) | 1 | 16 August 2024 |
EP-PL2 | LOTUS AP | Involve a LOTUS AP as a member of the Project Management / Project Owner team / Contractors | 1 | 16 August 2024 |
EP-PL3 | LOTUS AP | Involve a LOTUS AP as a member of the Project Operation team | 1 | 16 August 2024 |
EP-PL4 | Green Awareness | Display LOTUS signage on the exterior of the home or building. | 1 | 4 October 2024 |
EP-PL5 | Automatic Bathroom Taps | 90% of bathroom taps are touchless types, which have sensors to help people avoid touching the taps. | 1 | 4 October 2024 |
EP-PL6 | Automatic Urinals | 90% of urinal are touchless types, which have sensors to help people avoid touching the flush button | 1 | 4 October 2024 |
EP-PL7 | Smart Toilets | 90% of toilets should be smart toilet types, which have automatic cleaning programs for users and automatic flushing. | 1 | 4 October 2024 |
EP-PL8 | Non-baked material for roofs | 90% of all roofs are made up of non-baked materials | 1 | 4 October 2024 |
EP-PL9 | Non-baked material for flooring and wall finisher | 90% of all flooring and wall finisher are made up of non-baked materials | 1 | 4 October 2024 |
EP-PL10 | Non-baked material for hardscape area | 90% of all landscape paved area are made up of non-baked materials | 1 | 4 October 2024 |
EP-PL11 | Prefabricated Structure for slabs | 50% volume (m3) of slabs in the project that is made from prefabricated structure | 1 | 4 October 2024 |
EP-PL12 | Prefabricated Structure for slabs | 80% volume (m3) of slabs in the project that is made from prefabricated structure | 2 | 4 October 2024 |
EP-PL13 | Prefabricated Structure for beams | 50% volume (m3) of beams in the project that is made from prefabricated structure / 1 point | 1 | 4 October 2024 |
EP-PL14 | Prefabricated Structure for beams | 80% volume (m3) of beams in the project that is made from prefabricated structure | 2 | 4 October 2024 |
EP-PL15 | Prefabricated Structure for columns | 50% volume (m3) of columns in the project that is made from prefabricated structure | 1 | 4 October 2024 |
EP-PL16 | Prefabricated Structure for columns | 80% volume (m3) of columns in the project that is made from prefabricated structure | 2 | 4 October 2024 |
EP-PL17 | Prefabricated Structure for structural walls | 50% volume (m3) of structural walls in the project that is made from prefabricated structure | 1 | 4 October 2024 |
EP-PL18 | Prefabricated Structure for non-structural walls | 80% volume (m3) of non-structural walls in the project that is made from prefabricated structure | 2 | 4 October 2024 |
EP-PL19 | Prefabricated Structure for foundation piles | 80% volume (m3) of foundation piles in the project that is made from prefabricated structure | 1 | 4 October 2024 |
EP-PL20 | Prefabricated Structure for foundation piles | 100% volume (m3) of foundation piles in the project that is made from prefabricated structure | 2 | 4 October 2024 |
EP-PL21 | Green Cleaning | Develop and implement a green cleaning program which recommend project only use environmentally friendly cleaning products | 1 | 4 October 2024 |
EP-PL22 | Low-Eco Value Site Selection | Do not situate building on a site with high-eco value | 1 | 4 October 2024 |
EP-PL23 | Low-Eco Value Site Selection | Locate building on an infill or a redevelopment site | 1 | 4 October 2024 |
EP-PL24 | Cradle-to-gate Embodied Carbon | Calculate the cradle-to-gate embodied carbon of the project | 1 | 4 October 2024 |
EP-PL25 | Cradle-to-gate Embodied Carbon | Reduce the cradle-to-gate embodied carbon of the project by optimizing design | 2 | 4 October 2024 |
EP-PL26 | Reduce concrete usage for beams and columns | 1 EP point can be achieved if project have strategies to reduce the concrete usage for both Beams and Columns in Strategy B: Credit MR-1 | 1 | 10 October 2024 |
EP-PL27 | Reduce concrete usage structural wall | Can be achieved if project have strategies to reduce the concrete usage for structural walls | 1 | 10 October 2024 |
EP-PL28 | Mother’s Room | Provide Mother’s Room(s) or Lactation Room(s) inside project in Compliance with the Requirements of the Decision 5175/QĐ-BYT. | 1 | 17 October 2024 |